Home / Framing Takeoff Services

Framing takeoff services

Framing and lumber takeoffs from your plans, from $150, back in 2-3 business days. Every line cited to a plan sheet and checked by a framer with over 20 years in the trade.

What's in a framing takeoff

A lumber takeoff is only as good as the read of the plans behind it. I count framing the way a framing crew builds it: wall by wall, level by level, from your architectural and structural sheets.

  • Studs, plates, blocking and backing by size and length
  • Wall, floor and roof sheathing, with sheeted and unsheeted walls marked
  • Headers, beams and posts from the schedules
  • Every nail and connector: nails counted connection by connection from the nailing schedule (or the code's fastening table), plus hangers, straps, hold-downs and anchor bolts
  • A numbered wall list and wall-number PDF, a framing code checklist, and a questions list for anything the plans don't say

Trusses come from your truss supplier, so truss counts aren't included. I note truss type and spacing.

Lumber takeoff services for builders and GCs

Use it to send the same list to three yards and get quotes back apples to apples, or to check a yard's free takeoff before you order. Houses, multifamily and wood-framed light commercial. Work is done from PDFs, so the job can be anywhere in the US.

Framing expert

Framing-Only Takeoff

  • Up to 3,000 SF$150
  • 3,001-4,000 SF$225
  • 4,001-5,000 SF$300
  • Larger, multifamily quotedfrom $500

2-3 business days from approved, complete files. Rush within 1 business day for +30%, if my schedule allows. Upgrade to the Whole House (Full Material) Takeoff within 7 days and the framing fee is credited.

Start an Order

Five lines from a sample takeoff

Made-up exampleQtySource on your plansConf.
7/16 OSB wall sheathing, 4x8142 sheetsS-201 shear wall schedule + A-201/A-202 elevationsMed
2x6 studs @ 16", 9' walls612 EAA-101 wall M-E01 to M-E13, plate height per A-301High
Header, (2) 2x12, W3 openings4 EAA-101 Window Schedule W3 + S-201 header scheduleHigh
Hold-down HDU58 EAS-201 shear wall schedule, tag SW2High
Pantry wall M-I115'-2"A-101, low-confidence read: on your questions listLow
Made-up job, real layout. See the full sample.

Send the plans. No charge until I approve your files.

Start an Order

Start an OrderNo charge until approved